CLEANROOM PACKAGE SOLUTIONS

显示标签为“air shower clean room”的博文。显示所有博文
显示标签为“air shower clean room”的博文。显示所有博文

2015年7月1日星期三

Anlaitech Clean Room Air Shower Tunnel

Anlaitech Clean Room Air Shower Tunnel

company web: www.cleanroomffu.com
Alibaba shop: http://anlaitech.en.alibaba.com/

Clean Room Air Shower protects cleanroom environment from contamination.It can enhance cleanroom performance by removing surface contamination from clothing and garments of person.

Air Shower equipped with pre-filter and HEPA, by double-layers filtration system to ensure high air cleanness level.

Air shower is widely used in LCD and Optoelectronic Display, PCB, microelectronics, dust-free coating, aseptic packaging, medical care, Pharmacy,auto glass and precision parts.





Air Shower Room for GMP Standard  AL-AS-1300/P Series      

2014928111426246.jpg

Air Shower in producing:

2014928111434167.jpg


Economice material: epoxy powder coated steel outside and inside, stainless steel for base and door
QQ20141110161215.jpg




























Best sold material: epoxy powder coated steel outside, stainless steel 304 inside, #304 stainless steel for doorDSCF7458 Pharmaceutical  Clean Room Air Shower as Airlock Room.jpg

Non-rust material: full stainless steel 304 made.
full Electrical Safety Proved Stainless Steel Air Shower.JPG

Air Shower Indication:
QQ20141103215510.jpg


Air shower control panel:LED Display Air Shower Control Panel.jpg












Air Shower door closer:
Door closer for air shower.jpg



Air shower air velocity testing
DSCF3982 air velocity testing for industrial air shower.jpg
Export packing:
QQ20150506203414.jpgQQ20150506203419.jpg
Factory testing (all the sets you ordered):  

All of equipment is individually factory tested for safety and performance in accordance with international Standards. Each unit is shipped with a documentation outlining the tests undertaken and the unit’s individual results for each unit.

Factory test include:

--appearance testing

--functional test and visual inspection

--electrical safety tests

--air velocity testing

--noise testing



Warranty:

Our equipment is warranty for 1 year excluding consumable parts and accessories.

All equipment is shipped with a comprehensive use’s manual complete with a report documenting all test procedures.

Additional IO/OQ/GMP document is available upon request.

Contact our sales representative for specific warranty details or document request.  



Consumable parts illustration:

1: Pre-filter: each one should be replacement in each 6 month, but it can refresh no more three times.

2: HEPA air filter: each one should be replacement in each half and one years. 



Standard export packing:

--Stretch film strapped whole cabinet,

--Foam inside protected,

--Plywood case solid fixed

--European standard bottom tray



What you can get from us?

  1. 1.    Immediately responses for your inquiry and response saving your time, update your project processing.
  2. 2.       Professional design team matches all your ideas;
  3. 3.       Over 10years cleanroom, laboratory furniture and air filters producing experience guarantee the quality;
  4. 4.       Strictly factory testing take out your troubles in advance;
  5. 5.       ISO, CE, UL,TUV, SGS testing Certificates helped your business;
  6. 6.       With 18monthes Warranty card service your business in good way;
  7. 7.       Own the CNC machine, class 10000 clean room workshop, spray booth, 1300*1300 non-gap Mini-plated HEPA filter producing machine as well with over 5years clean room producing experience workers keep well each your orders.
  8. 8.       Completed of set documents issued with final products help you easy with our products.



With many thanks for your support, factory price is waiting for your response.


2014年10月15日星期三

We also not expect such a short period of time to complete 6sets Air Shower Clean room

We also not expect such a short period of time to complete 11sets Air Shower Clean room
Customer of AIMTR Electronics(
EMS industry) orders 11sets Air Shower room from us, delivery time beat our limited , fixed term must be used these air shower for their EMS industry clean room area, and only 24 hours downtime per month, but give a slightly shock to our manage Mr Liu who charged clean room equipment producing section, but order is signed, we shall try our best to do so.
Leave our sourcing and production times are only seven days time, and the quality is also very demanding, how to do it ? Procurement, is expected to open, spraying, grinding, assembly , quality control, packaging, logistics after a brief meeting, the rapid division of labor, work instantly .







Unexpected things tend to happen miraculously, orders 25th of Sept. smooth delivery than expected for almost a full day ahead of time to the customer. Afterwards, we Section Chief Liu and his colleagues are still surprised: " We did not expect such a short period of time to complete all set air shower rooms ," perhaps anxious customer anxious mentality appeal to every one of my colleagues , and it can not play out of our own imagine the energy to.

Prepared by:Corporate Communications Department of Anlaitech